需求超过了现有的 .3 MGD water pollution control plant, Glynn County turned to 澳门足彩app for a solution. The result was a 2 MGD facility upgrade to meet current demand with provisions to transition to 4 MGD when necessary.
One of the project’s most significant benefits was protection of the plant’s surrounding marsh area and natural habitats during construction. We used directional boring to limit environmental impact during effluent line installation and installed a unique river diffuser system, which immediately increased capacity to .5 MGD.
Our skilled craftsmen responded to the challenging concrete structures by constructing our first clarifiers and the largest oxidation ditch in our company’s history. The design of the project’s ultra-complex headworks required the use of every single 澳门足彩app forming method in this single structure.
County engineers were pleased to move through such a massive project without significant issues. We were equally proud to resolve Glynn County’s wastewater treatment shortage both on time and under budget.